10. WHAT IS THE SCHEDULE? The schedule for the upcoming weeks starts with developing moulds for my iso holds followed by getting my linkage angles right through rapid laser cutting and assembly. Once I get that right, the rest of the container design process starts getting fabricated. During the 3d printing processes, I will be utilising the time to develop a final board in Eagle incorporating the designs i developed in my last 4 months using ATMEGA328 and put that on milling. Time will be spent maily after this juggling between making the electronics work and assembly of the container. All this needs to be done in a span of 2 and a half weeks and requires intense design and fabrication speed from my side. Luckily these 4 months have increased my speed with all the machines available at the Ashram so lets see.